Most renovations start with demolition. We remove old coverings, walls and fittings, take away the waste and prepare the space for installations and new work. Then comes the masonry, which lays the groundwork for floors, walls and the finishing work.
Demolition
- removal of floor and wall coverings, tiles and parquet
- demolition of partition walls
- removal of sanitaryware and kitchens
- breaking up screeds and concrete elements
- chases and openings for installations
- removal of construction waste
Masonry
- building partition walls
- standard and dehumidifying plaster
- closing chases and openings after the installers
- screeds and floor levelling
- waterproofing coatings in bathrooms and on balconies
- fitting shelves and other elements
After the masonry we can continue with drywall construction, floor laying and painting.
What we need for an offer
- what needs to be demolished or built
- room dimensions or a floor plan
- photos of the current state
- the location and access (floor, lift)